Waterwatch Data Portal
ME_YBA500 Banyule Creek @ footbridge Banyule Flats Reserve
19 August 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500 |
Date and Time | Thursday 19th August 2010 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 620 | 0.02 | 7.8 | 12.9 | 11.8 | 10 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 50.00 |
Stream width | 1.00 |
Hazards | |
Litter/Pollutants |
water sample heated to over 18 degrees before testing Water a bit lower than Monday. Monday had heavy rain and the water was faster flowing and more turbid. Couldn't see the bottom of the creek on Monday, but could see it today.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au