Site visit details

Overview

Catchment Yarra River
Site Plenty River under Main Road (Circuit St) Bridge, Greensborough ME_YPL693
Date and Time Thursday 13th May 2010 16:05pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 7 500 0.05 7.7 14.2 13.4 30
Weather sunny and cloudy
Last rainfall Last 24 hrs
Flow estimate fast and normal
Water Appearance
Stream depth 50.00
Stream width 4.00
Hazards
Litter/Pollutants
Note; Phosphate and Ammonium were tested on 14/5/2010 at 22.7 'C- samples were filtered. Water level was a bit higher than last time. Muddy water stands out this time.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au