Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 13th July 2010 14:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 440 0.18 7.85 16.1 13.7 30
Weather Cloudy
Last rainfall Last 7 days
Flow estimate Trickle
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Whats changed since last time you monitored? Only trickle flow from drain What stands out about the site today? Plenty River looks lower too, have had less rain in last month, since previous sampling. Ammonia and phosphate samples tested at 18 degrees C Dissolved Oxygen not tested because flow is too small a trickle. Litter: Other includes 1 Tyre in Plenty River

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au