Waterwatch Data Portal
ME_ESU300 Sunshine Creek at Frankston school steps bridge, Mt Martha
4 October 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300 |
Date and Time | Monday 4th October 2010 14:20pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 2800 | 0.02 | 8 | 20.1 | 10.35 | 15 |
Weather | Overcast |
---|---|
Last rainfall | Last 7 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 20.00 |
Stream width | 4.00 |
Hazards | |
Litter/Pollutants |
4 days since last rain 3.4mm on 30/09/2010. Water still tannin stained with a small amount of foam on the surface. Dog footprints in mud beside the creek, under the bridge.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au