Site visit details

Overview

Catchment Yarra River
Site Boulevard Drain Siltation Pond (since 19/03/2006) ME_YYD807
Date and Time Sunday 19th September 2010 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 6.6 230 0.07 7.2 13.5 11.2 11
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate Slow
Water Appearance
Stream depth 30.00
Stream width 2.00
Hazards
Litter/Pollutants
rain: 2mm in last 24 hrs

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au