Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 30th October 2010 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 6 300 0.03 21.1 18.4 45
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate Fast
Water Appearance
Stream depth 150.00
Stream width 15.00
Hazards
Litter/Pollutants
There had been a lot of rain during October. Two weeks ago the depth was at least 2 meters deeper & one week before, it was 1 meter deeper.

Habitat

Migrated from old Melbourne data
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Fair 6 Poor 2 Fair 6 Fair 23

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au