Waterwatch Data Portal
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Salt Creek at Macleod ME_YSA500 |
Date and Time | Tuesday 19th June 2001 15:45pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 9.2 | 0.08 | 8.2 | 11 | 12 |
Weather | Not specified |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Not specified |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
No rain data available, more than a week ago entered as default phosphate value was multiplied by 0.326 to convert from mg PO4/L to mg P /L This will also been done for the data for 19/7/2001, but possibly should be done to other records in Anne Paul groups set from 2001. The other records weren't multipled by the 0.326 factor, because there was no indication on the record sheet that it was necessary. the person who completed the record sheet may have neglected to indicate whether the multiplication is necessary or not, due to ignorance or carelessness.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au