Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
31 December 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Friday 31st December 2010 00:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 8 | 300 | 0.02 | 8.2 | 32 | 20.3 | 45 |
Weather | Sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | None |
Water Appearance | |
Stream depth | 100.00 |
Stream width | 7.40 |
Hazards | |
Litter/Pollutants |
rainfall: 249mm since last time of monitoring, 29/10/2010 What has changed since last time you monitored? Dramatic changes in water level, sometimes up to and over the bridge, Bridge sides pushed over but repaired quickly. What stands out about the site today? Muddy banks, erosion, deposition, bark and twigs falling into river due to strong wind gusts. Strong current has undercut bridge support (Edendale side) Other observations: Orange mesh, used to warn public of bridge danger, remains as litter, caught up in streamside vegetation water level on stake: 15cm
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au