Site visit details

Overview

Catchment Yarra River
Site Plenty River under Main Road (Circuit St) Bridge, Greensborough ME_YPL693
Date and Time Tuesday 14th December 2010 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 9 320 0.1 7.7 35.7 21.1 50
Weather Sunny
Last rainfall Last 3 days
Flow estimate Fast
Water Appearance
Stream depth
Stream width 7.00
Hazards
Litter/Pollutants
35mm rain in last week, depth is double normal depth. plastic everywhere after floods. plenty river muddy and up quite high due to floods lots of rubbish on banks, esp plastic bags phosphate test filtered.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au