Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 14th December 2010 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 9 720 0.12 8.8 35.9 22.8 10
Weather Sunny
Last rainfall Last 3 days
Flow estimate Trickle
Water Appearance
Stream depth 0.01
Stream width 10.00
Hazards
Litter/Pollutants
high flood levels, now receding in Plenty River water very muddy looking in Plenty River, concrete pad has a moudly tinge, algae growth. concrete pad has an algal growth.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au