Site visit details

Overview

Catchment Goulburn River
Site Baronga Creek at Creightons Creek GB_BAR010
Date and Time Sunday 16th January 2011 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb FTU Turb NTU
Sample 120 6.5 27
Weather
Last rainfall During the last week 100
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall: Since 19th December 2010 had three weeks of NO rain, then had 100 mm week of 10th Jan 2011 EC similar to December Turbidity due to run off, significantly higher at most sites. PEA010 and JIM010 only slightly raised.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au