Waterwatch Data Portal
GB_CRE011 Creightons Creek at Bartons Lane
20 March 2011
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Bartons Lane GB_CRE011 |
Date and Time | Sunday 20th March 2011 00:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 170 | 6.4 | 15 | 18 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: 34mm in March since 28 Feb. EC: Much the same as Feb. Turbidity: Slight increase at nearly all sites.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au