Waterwatch Data Portal
GB_CRE011 Creightons Creek at Bartons Lane
17 April 2011
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Bartons Lane GB_CRE011 |
Date and Time | Sunday 17th April 2011 00:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 160 | 10 | 12 |
Weather | |
---|---|
Last rainfall | During the last week |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: 25mm since 20th March, 50mm in April to 17th. EC: Slightly lower. Turbidity: Despite rain in week before (28.6mm on Sunday prior 10/04/11, elders website) turbidity lower at all sites excepts CRE002, probably due to ground cover reducing run off.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au