Site visit details

Overview

Catchment Goulburn River
Site Dabyminga Creek at Ennis Road Ford GB_DAB015
Date and Time Monday 11th July 2011 11:45am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 93 10.8 252 6.9 10 8.4 11
Weather windy
Last rainfall During the last 24 hours 1.6
Flow estimate Rapid
Water Appearance Stained green
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
Moderate to fast flow, rise in water level after rains of previous 24hrs.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au