Waterwatch Data Portal
Site visit details
Overview
Catchment | Mallee |
---|---|
Site | Red Gum Gully Boardwalk MA_RMU380 |
Date and Time | Saturday 5th March 2011 16:52pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|
Sample | 280 | 7 | 0.15 | 24.3 | 26 |
Weather | |
---|---|
Last rainfall | More than a week ago |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
River has dropped over a metre. 2 ravens, and pobblebonk frogs present. House boat and jet ski across river may influence turbidity.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au