Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
20 September 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 20th September 2011 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 6 | 140 | 7.4 | 0.1 | 17 | 100 |
Weather | raining |
---|---|
Last rainfall | Raining Now |
Flow estimate | Rapid |
Water Appearance | Other: very dirty |
Stream depth | 0 - 50cm |
Stream width | 1.0 |
Hazards | |
Litter/Pollutants |
drain flowing faster than usual, probably due to local recent/current rainfall
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au