Waterwatch Data Portal
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Fay's GB_CRE012 |
Date and Time | Sunday 21st August 2011 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|
Sample | 140 | 20 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: since 17/7/11 38 mm in July, ~ 80 mm in August. EC: lower at all sites Turbidity: higher at all sites except CRE014 and JIM010
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au