Waterwatch Data Portal
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Fay's GB_CRE012 |
Date and Time | Sunday 19th June 2011 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|
Sample | 130 | 120 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: since 15th May, 30 mm in May, 30 mm in June until 19th EC : small decrease at most sites Turbidity: small increase at about half of the sites Turbidity at this site was ~120 NTU about 9 hours after approx 20 mm of rain
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au