Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 19th April 2011 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.04 7 1430 7.7 0.25 19.5 17.7 200
Weather cloudy
Last rainfall During the last week
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
phosphate estimated at 0.45 using dilution of 30% reacted sample with 70% deionised water phosphate and ammonia samples filtered

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au