Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 17th May 2011 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.5 10 410 8 0.25 16.3 14.4 400
Weather overcast
Last rainfall
Flow estimate Rapid
Water Appearance Muddy,Milky,Foamy/frothy
Stream depth 0.02
Stream width 0.5
Hazards
Litter/Pollutants
phosphate estimated at: 0.3mg/L using dilution. Ammonium estimated at 1.5mg/L usingdilution. ammonium and phosphate samples filtered and warmed.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au