Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
17 May 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 17th May 2011 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.5 | 10 | 410 | 8 | 0.25 | 16.3 | 14.4 | 400 |
Weather | overcast |
---|---|
Last rainfall | |
Flow estimate | Rapid |
Water Appearance | Muddy,Milky,Foamy/frothy |
Stream depth | 0.02 |
Stream width | 0.5 |
Hazards | |
Litter/Pollutants |
phosphate estimated at: 0.3mg/L using dilution. Ammonium estimated at 1.5mg/L usingdilution. ammonium and phosphate samples filtered and warmed.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au