Site visit details

Overview

Catchment Yarra River
Site Plenty River at Gorge Rd, South Morang, downstream of bridge ME_YPL280
Date and Time Sunday 14th August 2011 09:25am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 9.1 380 7.5 10 9 92 40
Weather cloudy
Last rainfall During the last 24 hours 1
Flow estimate Rapid
Water Appearance Muddy
Stream depth >2m
Stream width >5m
Hazards
Litter/Pollutants
Water level was 9cm below my reference point, which is 8cm higher than when last measured. At Mill Park I have had 1mm of rain in the last 24 hours, 8mm in the last 7 days.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au