Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
14 February 2012
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Tuesday 14th February 2012 09:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 6 | 560 | 7.1 | 0.15 | 19.9 | 20.5 | 27 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Not Flowing |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,cans,packets,plastic,polystyrene,other |
A lot of dead trees, branches and other vegetation build up on banks and in creek from frequent recent floods. One log about 20m lying in creek under bridge. Build up of silt and gravel in middle of creek on upstream side of pedestrian bridge. Bank soil profile changing due to extensive erosion. A rock layer is now evident.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au