Site visit details

Overview

Catchment Yarra River
Site Mullum Mullum Creek in MM Reserve ME_YML030
Date and Time Thursday 22nd September 2011 09:22am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 0 3.4 140 7.6 0.01 17 14.5 30
Weather sunny
Last rainfall During the last week
Flow estimate Moderate
Water Appearance Muddy,Stained brown
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,packets
participants: Dave, Michael and Joel dead rat near sand collection point. ammonium test- good match phosphate- slight difference lots of surrounding weeds since last time

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au