Site visit details

Overview

Catchment Bunyip River
Site Warringine Creek downstream of Henderson/Boes Rd bridge ME_EWA080
Date and Time Monday 27th December 2010 14:05pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1800 7 0.1 18.7 15.3 15
Weather cloudy
Last rainfall During the last week
Flow estimate Moderate
Water Appearance Other: discoloured
Stream depth
Stream width
Hazards
Litter/Pollutants
Water flowing steadily over the creek, white froth just past edges of the pipe, 20cm across. Dead branches across half of the creek and blocking 4 arches of the bridge, 1 arches free of debris but not flowing. Flow only over width of 1.5m. Persons conducting tests: Adrienne Meyer, Trevor Meyer.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au