Site visit details

Overview

Catchment Bunyip River
Site Warringine Creek at Carpenters Lane North Bridge ME_EWA060
Date and Time Saturday 20th November 2010 12:15pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 2000 6.8 0.1 25.4 18.6 30
Weather sunny
Last rainfall During the last week
Flow estimate Slow
Water Appearance Other: discoloured slight
Stream depth 0 - 50cm
Stream width 1.8
Hazards
Litter/Pollutants
Weed and grasses showing Low water with a mound of earth in the centre above 30cm flow one side of mound only. 1.8m across creek covered with plants. Water appears still 2m upstream but is flowing at the bridge. Persons conducting tests: Adrienne Meyer, Trevor Meyer

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au