Waterwatch Data Portal
ME_EWA080 Warringine Creek downstream of Henderson/Boes Rd bridge
20 November 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Warringine Creek downstream of Henderson/Boes Rd bridge ME_EWA080 |
Date and Time | Saturday 20th November 2010 12:45pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 1500 | 7.1 | 0.1 | 25.4 | 18.8 | 30 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | Slow |
Water Appearance | Other: discoloured |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Water flowing steadily over the creek, white and pale brown froth just past edges of pipe. 40cm across. Dead branches across half othe creek and blocking 3 arches of the bridge, 2 arches free of debris but not flowing. Flow only over width of 1.5m. Persons conducting tests: Adrienne Meyer, Trevor Meyer.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au