Waterwatch Data Portal
NC_MYR250 Myrtle Creek at the Bendigo-Sutton Grange Road bridge
15 March 2012
Site visit details
Overview
Catchment | Campaspe River |
---|---|
Site | Myrtle Creek at the Bendigo-Sutton Grange Road bridge NC_MYR250 |
Date and Time | Thursday 15th March 2012 11:30am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 750 | 7.4 | 0.02 | 22.4 | 20.9 | 10 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 9 |
Flow estimate | Temporary |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,cans |
1 plastic soft drink bottle, 1 old glass bottle, 1 old steel can : removed
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au