Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300
Date and Time Monday 8th August 2011 14:10pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 7 2700 7.9 0.02 12 9.5 10
Weather cloudy
Last rainfall During the last week
Flow estimate Moderate
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,packets
What has changed since last time you monitored? Two days since last rain 2mm 6/8/2011. What stands out about the site today? water level in pondage low but flowing steadily Other observations: Rainfall: Last Week 3 mm; July 67.4mm: 2011 to date 617.8mm. (Devilbend Reservoir figures from Melb Water website) (Devilbend Reservoir figures from Melb Water website)Persons monitoring: Geoff Linnell - Sunshine Reserve Conservation & Fireguard Group Inc.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au