Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at upper site on left side of split ME_ESU100
Date and Time Monday 5th December 2011 12:05pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 730 6.3 0.02 19.5 13 40
Weather sunny
Last rainfall During the last 24 hours
Flow estimate Not Flowing
Water Appearance Stained brown
Stream depth 0 - 50cm
Stream width 0.6
Hazards
Litter/Pollutants
What has changed since last time you monitored? Last rain 0.2mm yesterday What stands out about the site today? Water stained dark orange. Significant orange filament material clinging to submerged objects in the water. Thin film on water surface, disperses when touched, indicative of iron bacteria. Other observations: Rainfall: Last Week 9.4 mm; October 82.2mm; November 136.4mm 2011 to date 948.4 mm. (Devilbend Reservoir figures from Melb Water website)Persons monitoring: Geoff Linnell - Sunshine Reserve Conservation & Fireguard Group Inc.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au