Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 28th April 2012 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 8 440 7.4 0.05 16.9 12.4 50
Weather sunny
Last rainfall During the last week
Flow estimate Slow
Water Appearance Muddy
Stream depth 0.65
Stream width 12.0
Hazards
Litter/Pollutants bottles,paper,plastic,other
Other litter included car tyre + roadworks safety orange tape

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au