Waterwatch Data Portal
GB_DRY003 Dry Creek at Broadford-Wandong Road, Wandong
28 November 2016
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Dry Creek at Broadford-Wandong Road, Wandong GB_DRY003 |
Date and Time | Monday 28th November 2016 09:15am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 770 | 0 | 14.3 | 16.5 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago 14.00 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Muddy |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Since the rains we had a few months back, the water levels have dropped in the creek and the amount of debris washed down stream has increased.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au