Waterwatch Data Portal
GB_CRE002 Creightons Creek u/s of Threlful Creek
18 September 2016
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek u/s of Threlful Creek GB_CRE002 |
Date and Time | Sunday 18th September 2016 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 90 | 6 | 11 | 29 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: 32mm in August, 77 mm in September
EC: lower at all sites
Turbidity: same as August at 4 sites, slight increase at other sites
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au