Site visit details

Overview

Catchment Yarra River
Site Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809
Date and Time Monday 23rd January 2017 09:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.41 3.6 990 6.1 0.36 25 20 9
Weather sunny
Last rainfall During the last week 20.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width Other:1m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au