Waterwatch Data Portal
ME_YDI847 Karingal Creek, crn Susan and Brougham St, Eltham
6 December 2016
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847 |
Date and Time | Tuesday 6th December 2016 14:40pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 1 | 6 | 670 | 6.3 | 0.13 | 22.5 | 19.4 | 50 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 4.80 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy,Oily |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | oil,paper,cans,other |
Ammonium and phosphate were high...test solutions needed to be diluted 1:1 to get a reading
Turbidity was also high, so filtering was required pre-Ammonium and pre-Phosphate testing
EC was significantly higher compared with upstream at the Fort Knox site, although pH results were the same at both sites
The car tyre was still there again this month, and also a bicycle wheel
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au