Site visit details

Overview

Catchment Yarra River
Site Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847
Date and Time Tuesday 6th December 2016 14:40pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1 6 670 6.3 0.13 22.5 19.4 50
Weather cloudy
Last rainfall During the last week 4.80
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy,Oily
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants oil,paper,cans,other

Ammonium and phosphate were high...test solutions needed to be diluted 1:1 to get a reading

 

Turbidity was also high, so filtering was required pre-Ammonium and pre-Phosphate testing

 

EC was significantly higher compared with upstream at the Fort Knox site, although pH results were the same at both sites

The car tyre was still there again this month, and also a bicycle wheel

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au