Site visit details

Overview

Catchment Barwon River
Site Bruces Creek @ Bannockburn CO_BRU100
Date and Time Wednesday 12th October 2016 11:15am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 68.07 7 7100 7.8 0.01 14 13 28
Weather raining
Last rainfall Raining now
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width
Hazards Trip on rocks
Litter/Pollutants

Plastic debris washed in from drain.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au