Waterwatch Data Portal
GB_WGS003 Outlet pit of bioremediation basin - Wetland at Gemmills Swamp
28 September 2016
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Outlet pit of bioremediation basin - Wetland at Gemmills Swamp GB_WGS003 |
Date and Time | Wednesday 28th September 2016 13:40pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 12 | 28 | 2.8 | 96 | 107 | 5.9 | 6 | 15.1 | 0.32 | 6 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Significant levels of E coli occur at WGS001 but reduces as water reaches Gemmill Swamp outlet WGS004.
Total phosphorus remains high through the retention basin this sampling.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au