Waterwatch Data Portal
GB_LKL004 Amaroo Lake at letterbox pit
30 November 2016
Site visit details
Overview
Catchment | Broken River |
---|---|
Site | Amaroo Lake at letterbox pit GB_LKL004 |
Date and Time | Wednesday 30th November 2016 11:10am |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 29 | 101 | 8.2 | 127 | 7.8 | 0 | 23.7 | 0.16 | 114 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
High oxygen levels and high turbidity may have been influenced by high winds.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au