Site visit details

Overview

Catchment Yarra River
Site Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808
Date and Time Thursday 16th March 2017 09:35am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 2.37 65.11 5.8 250 7 0.34 21 21 30
Weather overcast
Last rainfall During the last 24 hours 4.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

There had been a heavy downpour of rain in the north-east suburbs. This site is the meeting point of two storm-water drains.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au