Site visit details

Overview

Catchment Yarra River
Site Plenty River at Gorge Rd, South Morang, downstream of bridge ME_YPL280
Date and Time Sunday 6th May 2012 11:35am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 8.1 360 7.9 15 12 111 80
Weather overcast
Last rainfall During the last week 3
Flow estimate Moderate
Water Appearance Muddy
Stream depth >2m
Stream width >5m
Hazards
Litter/Pollutants
Water level was 21cm below my reference point, which was 7cm higher than when last measured. At Mill Park I have had no rainfall in the last 24 hours, 3mm in the last 3 days, and 30mm in total in the last week.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au