Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, Drain outlet into Creek, downstream of Murray Road/Soutern Road bridge, Preston/Heidelberg Heights ME_YDA436
Date and Time Sunday 30th April 2017 13:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.9 10 780 6.4 0.15 17 17.2 9
Weather sunny
Last rainfall During the last week 0.00
Flow estimate DRY: No continuous flow in channel and no pools
Water Appearance Milky
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au