Site visit details

Overview

Catchment Yarra River
Site Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808
Date and Time Thursday 18th May 2017 09:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.05 69.73 7.4 1260 7.6 0.023 12 12.5 9
Weather overcast
Last rainfall During the last 24 hours 2.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width > 5m
Hazards
Litter/Pollutants

Low Amm-N & Phos results for today at all sites probably attributable to two things:

1. No recent chemical fertilisation of football ovals &  golf course and 2. good flushes of rainwater during April.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au