Site visit details

Overview

Catchment Bunyip River
Site Bittern Dam, near dam wall and catch drain ME_EBI100
Date and Time Thursday 25th May 2017 09:40am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 8 980 0 7.8 0.01 16 13.6 9
Weather cloudy
Last rainfall More than a week ago 2.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width Other:250
Hazards
Litter/Pollutants

water lower. large number of water birds

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au