Site visit details

Overview

Catchment Goulburn River
Site Mollison Creek at Weir Wall Power St, Pyalong GB_MOL005
Date and Time Thursday 1st September 2016 09:55am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm Rain mm Air ° C Water ° C Turb NTU
Sample 270 23.5 15.7 11.5
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Turbidity with tube 18 NTU

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au