Site visit details

Overview

Catchment Goulburn River
Site Brankeet Creek at Cochrane Ln Ancona GB_BKT015
Date and Time Thursday 20th April 2017 14:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Water ° C Turb NTU
Sample 82 8.2 103 7.1 0 14.4 6.3
Weather
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Macro sample site and date. Phys chem tests taken.  Water level lower than November 2016. Lots of willow and poplar leaf litter in the creek and on the banks. More overgrown than November 2016.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au