Site visit details

Overview

Catchment Bunyip River
Site Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby. ME_DBC250
Date and Time Friday 30th June 2017 10:40am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 70.44 7.8 150 6.6 0.1 11 10.8 30
Weather sunny
Last rainfall During the last 24 hours 5.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

The change in electroconductivity may be caused by rainfall in the last 24 hours. Cattle are now in the paddock next to Blind Creek. This may effect our results next month.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au