Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Monday 8th August 2016 10:10am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 0.07 7.4 4090 7.7 0.06 10.8 10.7 7.93
Weather overcast
Last rainfall During the last week 0.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants bottles,plastic,cans,packets

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au