Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Sunday 5th February 2017 20:35pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 0.01 87 6.8 0 19.5 20.8 246.6
Weather raining
Last rainfall Raining now 31.70
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Muddy
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants polystyrene

Test done specifically to measure  turbidity during high stormwater flows. In this case 31.7mm had fallen since 17.30 (last 3 hours) with peak rates up to 100 mm/hr.

Bank erosion upstream and siltation downstream is an increasing threat to river health.

Turbidity during high flows is up to 100 times background levels.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au