Site visit details

Overview

Catchment Yarra River
Site Tandarook stormwater drain into Mullum Mullum Ck, Donvale ME_YMD100
Date and Time Tuesday 22nd August 2017 09:30am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 94.86 10.7 240 1.02 6.8 0.068 4 10 14
Weather sunny
Last rainfall During the last 24 hours 3.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Other
Stream depth
Stream width
Hazards
Litter/Pollutants bottles,paper,plastic,cans

10.7ppm  is the result we got on the Colorometer for DO

 

The Tritration figure we got was 9.6 mg/L DO

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au