Site visit details

Overview

Catchment Yarra River
Site Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847
Date and Time Wednesday 11th October 2017 12:15pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 2 6 420 7 0.4 19.8 12.7 24
Weather overcast
Last rainfall During the last week 10.20
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Milky,Oily
Stream depth Other:10 cm
Stream width Other:4 metres
Hazards
Litter/Pollutants paper,plastic

New pH meter used as from today: an Eco Testr pH2

Ammonium and Phosphate were extremely high. I had to dilute the sample x4 to get a reading in each case.

A pair of ducks flew out from the “tunnel” as we arrived, presumably still roosting in there somewhere

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au