Site visit details

Overview

Catchment Barwon River
Site David St Stormwater drain, The Esplanade, Indented Head CO_IND009
Date and Time Monday 30th October 2017 10:20am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 76.17 7 19710 8 0.11 17.5 16 10
Weather cloudy
Last rainfall During the last 24 hours 4.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Scummy,Muddy,Stained green
Stream depth 51cm - 99cm
Stream width > 5m
Hazards
Litter/Pollutants

A site risk assessment was done for this site. Scum on water surface is algae.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au